Hi All,
We have a situation where we have transferred an org structure from oru R/3 system to our CRM 5.0 system.
Org integration is set up correct and most of the Org units have been linked to a BP (all have had a BP set up in the Org Unit role, but some not linked).
How do we link the existing Org Unit BP to the Org unit in the org structure (ppoma_crm).
I have ran CRM_COM_ORGMAN_BUPA_INTEGRATE and tried to get it to repair but it just reports that the BP alrteady exists and doesn't actually link them together....
I have also tried adding a relationship of type B207 to the unit through PP01 but it will not accept this type of relationship cannot be maintained through a basic transaction...
Please help as we have had a number of issues in the production system with the org load that we never had in either dev or QA and now approaching go-live... so downloading the org structure again isn't really an option (and may still have unlinked orgs)..
Many thanks in advance
Gary Hawkins