Metric Value problem

Hi all,

In xMII12, Active portal and Metric sample project always shows the current metric value is Zero. And the system alert log shows premature end file.

How can I solve this problem?

Thanks in advance

Murali

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Apr 24, 2008 at 01:30 PM

    Did you set up everything according to the readme file?

    You should be able to run the ActivePortalMonitor transaction to see what is failing.

    Regards,

    Jamie

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Jamie Cawley

      I hate to jump on such a dated thread, but I was wondering if applying the latest service pack solved Murali's issue?

      I was also on 12.0.2 having the same issue with Activity portal, 'Premature end of file' and 'zero' values recorded in the activity log when run by the scheduler, but no issues when run from workbench.

      I upgraded to 12.0.5.2, and am still having the same issue. Any assistance would be appreciated.

      Rod Hoffman

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.