Target cost is not calulated by target cost version 0 using T-code KKS2.

I executed the variance calculation for production orders using t-code

KKS2 for target cost version 0.

The variance calculation generated message KV154.

I tried to verify the target cost which was calculated by target cost

version 0 using t-code CO03.

The target cost was not calculated by target cost version 0.

The below setting is maintained in Cost Object Controlling for target

cost version 0.

.the variance variant has been maintained

.control costs = actual costs

.target costs = current standard cost estimate.

How can I solve the problem?

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Apr 24, 2008 at 06:25 AM

    I soleved it.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.