how to create a production plan in S4HANA

Jan 08 at 04:06 PM


avatar image

After running the MRP (production plan) in SAP S4HANA all the requirement are planned on one work center while all other work centers are not used. The SAP consultant advised that we should do the distribution of the load and the order sequencing manually in capacity leveling.

Is there is any other options in SAP to do it automatically? can PPDS did that? both the distribute the requirements on all the available resources and do the sequences for the planned orders.

what were looking for from SAP is to upload the annual forecast (monthly bucket) and run the system to give us different scenario of production planning with respect to available resouces and other variables such setup matrix, planned maintenance and minimum run.