cancel
Showing results for 
Search instead for 
Did you mean: 

How can I apply 2 billing plan in a contract?

Former Member
0 Kudos

Please suggest I have a new requirment software trading

Details

1. service material

2. Contract--> billing

3. Charge heads ,

Instlation charges (One time)

Royelty chargess (Yearly)

Usage charges per person (Monthly)

My Question : How can I assign two different billing plan for a same material in a contract without repeeting the line item in contract with same mat code because I do not realy on user that he will put different item catagory correctly or not .

Please help

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

I dont think there is a way to use 2 different Billing plans for the same line item without doing an enhancement. If I were you I would address this like a training issue rather than doing such a huge enhancement.