cancel
Showing results for 
Search instead for 
Did you mean: 

Regarding cost center

Former Member
0 Kudos

hi guys

I do have doubts regarding Cost center in Pipeline process

error*****

in Transaction code MB1A if i give my own cost center it

gives the following error..becos i havent created cost center

error*****

Cost center YR01/1222 does not exist on 22.04.2008.

Message no. KI222

Diagnosis

Cost center 1222 in controlling area YR01 does not exist on 22.04.2008. The SAP System determined controlling area YR01 automatically from the company code (and business area).

Procedure

Create the cost center.

Alternately, assign to an existing cost center, order, or project.

regards

Jino

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

So what is your question?

Former Member
0 Kudos

Please guide me the way to

create cost center

what are the measure to be taken for creating a cost center!

Former Member
0 Kudos

create cost center with tcode KS01

make sure you should enter the from date is always atleast one month back date

e.g. if you are creating today thatn you should enter the from date as 03/22/08

just enter the reqd fields and cost center category must be logistic of production'