cancel
Showing results for 
Search instead for 
Did you mean: 

Pricing confriguation with billing plan

Former Member
0 Kudos

I need to maintain the settting for Contract related billing for services material.

for that three chargess

Price1 one time charge Instlation charges

Price2 royelty charges pre yeary

price3 Commision share 2.5 %

Please help how can I devlop the same with one Item

With regards

Ajit

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Ajith,

Can you please explain the scenario?

Regards

Ravi

Former Member
0 Kudos

Please suggest I have a new requirment software trading

Details

1. service material

2. Contract--> billing

3. Charge heads ,

Instlation charges (One time)

Royelty chargess (Yearly)

Usage charges per person (Monthly)

My Question : How can I assign two different billing plan for a same material in a contract without repeeting the line item in contract with same mat code because I do not realy on user that he will put different item catagory correctly or not .

Please help

Former Member
0 Kudos

As per my understanding, Installation Charge can be created as one condition type & Royalty charge as another. I am not clear about Commision Share.

Pricing Procedure:

Determination of Pricing Procedure:

In SD, Pricing Procedure is determined based on Sales Area (Sales Organization + Distribution Centre + Division) + Customer Pricing Procedure + Document Pricing Procedure through T.Code: OVKK. Sales Area is determined in Sales Order Header Level. Customer Pricing Procedure is determined from Customer Master. Document Pricing Procedure is determined from Sales Document Type / Billing Type (if configured). Once the pricing procedure is determined, Condition records are fetched. If appropriate condition records are found, the price is determined. If Mandatory pricing condition is missing, system will through an error message.

Configuration of Pricing Procedure:

Step 1:

Condition table (T.Code: V/04): If existing condition table meets the requirement, we need not create a new condition table. Considering the requirement for new condition table, the configuration will be done in spro as follows: IMG --> Sales & Distribution --> Basic Function --> Pricing Control --> Condition Table (select the required fields combination, which will store condition record).

Step 2:

Access Sequence (T.Code: V/07): If existing access sequence meets the requirement, we need not create a new access sequence. Considering the requirement for new sequence, the configuration will be done in spro as follows: IMG --> Sales & Distribution --> Basic Function --> Pricing Control --> Access Sequence (Access sequence is made up of Accesses (Tables) & the order of priority in which it is to be accessed. Here we assign the condition table to access sequence.

Step 3:

Condition Type (T.Code: V/06): If existing condition type meets the requirement, we need not create a new condition type. Considering the requirement for new condition type, the configuration will be done in spro as follows: IMG --> Sales & Distribution --> Basic Function --> Pricing Control --> Condition Type. It is always recommended to copy an existing similar condition type & make the neccessary changes. Here we assign Access sequence to Condition type.

Step 4:

a. Pricing Procedure (T.Code: V/08): It is recommended to copy a similar pricing procedure & make the neccesary changes in new pricing procedure. Pricing Procedure is a set of condition type & arranged in the sequence in which it has to perform the calculation. Considering the requirement for new Pricing Procedure, the configuration will be done in spro as follows: IMG --> Sales & Distribution --> Basic Function --> Pricing Control --> Pricing Procedure --> Maintain Pricing Procedure.

b. Pricing Procedure (T.Code: VOK0): After maintaining the pricing procedure the next step will be determination of pricing procedure. Configuration for determining pricing procedure in SPRO is as follows: IMG --> Sales & Distribution --> Basic Function --> Pricing Control --> Pricing Procedure --> Determine Pricing Procedure.

5. Condition record (T.Code: VK11 / VK12): Condition record is a master data, which is required to be maintained by Core team / person responsible from the client. During new implementation, the condition records can be uploaded using tools like SCAT, LSMW, etc. Condition Record is maintained in T.Code: VK11 / VK12, which are captured in Sales Order & Billing.

Also check document pricing procedure in Sales Document Type (T.Code: VOV8 - Sales order Type, VOFA: Billing Type (If Required)), customer pricing procedure in Customer Master Data (T.Code: XD02), ... are in place.

Regards,

Rajesh Banka

Reward points if helpful

Former Member
0 Kudos

Please reply about duail billing plan