Skip to Content
0
Former Member
Apr 22, 2008 at 04:27 AM

write code for this its urgent

14 Views

hi its a alv bills of material report plz write code for this

Develop a report to high light the bom and/or master receipes fall into the constrained planning horizon those are not ready for porduction

this report will identity the items with a bom with a status other that 03(ready for production) and/or master receips witha a status other than 04(released). the items will be reveiwed in predefined horizon.

within a few weeks of entering the 18 th week constrained planning horizon.

for this report take bom tables stko,stpo,mast.

in sel-scren take mrp controller, plant, divison.

send immedialtly