Former Member
0 Kudos

hi

I have only one planned order with Exception message 62 i.e. master data inconsistent and all other planned orders of this material are having no exception message.

I am running MRP again with planning mode = 2

but still exception message is not going.

Amit

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi amit,

pls check in the Master data tab of the Planned Order , whether the BOM and Routing has been transferred into.

If not check the validity date of BOM & Routing with the explosion date in the Planned order - Master Data - BOM tab.

Regards,

Sheik

Former Member
0 Kudos

hi,

I have checked the master data tab already. only BOM is transferred and not routing .But in other planned orders of same material how routing has been transferred if validity is the problem

Amit

Former Member
0 Kudos

Hi,

pls check the validity date of both Header & operations of the Rotuing with the order start date of planned order.

Also , try to schedule the Planned Order

( pls check whether it throws an error : No valid routing selected )

Edited by: sheik abdulla on Apr 21, 2008 12:21 PM

Former Member
0 Kudos

hi

when I try to schedule the planned order again , it throws an error message : NO valid routing can be selected.

Amit

Former Member
0 Kudos

Hi,

You said that for the same material , you have some other planned orders into which the routing is transferred - right?

so , pls change the order start date of this planned order with the start date of those problem free planned orders and try to schedule this planned order again. If now, this planned order gets scheduled and routing is transferred /Det sched tab is added , then we can conclude that the problem is with the validity date only.

pls check

Former Member
0 Kudos

hi Sheik

I tried to change the start date in the planned order same as my problem free orders and try to schedule it.

But same message comes : NO valid routing can be selected.

Amit

Former Member
0 Kudos

Hi amit,

Have you checked the order qty of this pl order with the lotsize of Routing?

Former Member
0 Kudos

hi

Thanx Sheik, I forgot to check that

Thanx a lot

Amit