on 04-18-2008 5:20 PM
Hi
I have another issue, I need to do the credit check in deliveries, if the sales order has 20 days being created, is this possible by configuration??. Or do i have to activate any Exit in the credit control configuration?.
Thanks!
Soraya
Hi soraya
I think it is possible in standard SAP only .
if your order is created 20days back and if you have assigned a dynamic credit check then for the time horizon make it 1 month .
so if your order is 20days back and if you are doing delivery on 21st day then i think system will do credit check for the order
but you need to set up in configuration in OVAD, which is for delivery for document types.
Regards
Srinath
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks,
I already have configured the document LF in OVAD with 02 (Delvery), now do i have to go to OVA8 and copy the configuration i have for sales orders with document credit group 01 in deliveries 02 , then modify the new credit control area copied and change the horizon to 1 month?. In the credit control for the orders i don't have a dynamic verification i have a static with C reaction, do you think this will work??.
Regards
Soraya
Hi sorya
First of all , for static credit check you wont be having time horizon , so you need to go for , dynamic credit check only. so to change the time horizon from months to days or weeks or vice versa . use info structure S066.
In OVA8 , you can i think you can go with the same credit control area but only thing is assign in simple credit check step make it as D(automatic credit control) and credt group as 02(credit group at deliveries) , so in OVA8 , make the settings as credit control area risk category and the credit group for deliveries (02) as your requirement is to check at delivery level
Regards
Srinath
hi sorya
As S066 is a standard structure ,whatever data is that has been recorded that will be stored in this infostructure only.
Example:
For example , you might have made your time horizon in days (T), in OVA8 and now if you are trying to change these days to month (M) then whatever records are there that will be lost as all those records are in days those data will be lost
May be use t.code OLI7 ,which is used to update past histroy records also ,so after changing just use OLI7 and check wheather old records are getting updated or not .
Regards
Srinath
Hi friend,
Use time horizone.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.