Skip to Content
0
Former Member
Apr 18, 2008 at 05:18 AM

Datasource mapping after upgradation from r/3 4.7 to ECC 6.0

9 Views

Hi All,

Currently we have BI 7.0 Dev, Quality and Production system which were mapped to respective R/ 3 systems (Dev,quality& production). We have upgraded our source system to ECC 6 from 4.7 and we would like to conduct UAT after this upgradation.

Here I am listing down all of my questions involved in this process.

1. All the datasources which are in Acitive vesion in R/3 4/7 system will be remain in Active verion in ECC 6 after upgradation.

2. Or do we need to Activate this datasource manually in ECC 6

3. If any datasources are having enhancements, automatically it will presented in ECC 6.

4. Is there any utility to find all the active datasource in old system (4.7) to copy in ECC 6 with exits.

In the BI part:

1. Do we need to activate data sources again in BI system or automatically it will be performed.

I would like to know step by step activities that needs to be perfromedn in ECC 6 and BI 7.0 systems.

Thanks,

Venkat