Dear Sir,
What are MRP plant parameters?Pl.Explain in details?
Points will be rewarded......
Hi Sonal,
MRP plant parmaters are maintained in transaction OPPQ.
Order type for convertion of planned order into production order is maintained,
If order start in past allowed or not,
Bom selection,routing selection id etc are maintained.
The planning horizon period, special procurement key are also maintained here.
Regards,
Senthilkumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
In the Plant Parameters - OPPQ , the parameters necessary for the MRP run at Plant Level.
Say How the BOM/ Routing selection shd take place ,
On which date the BOM shd be exploded ,
how the prposals shd be Scheduled,
which Addl Stocks shd be considered for Net Req Calc , Checking rule for Av Check etc....
are defined.
Regards,
Sheik
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
The In this step, you can maintain all the plant parameters
1.Environment : Here you define the number ranges and the Backorder checking rule.
2.Master data: Like mrp controller,Speical procurment type and the Float - scheduling marging key can be configureed here
3.Conversion of planned order to productin order /Purchase requistion can be configure here
4. Planning urn : the selection of BOM ,Bom explosion,available stock etc and lot more can be configured here
Even though we have separate areas where we can define each of them separately here we can define most of the mRP related to single plant can be configured at this one.
Kindly let us know if this solves your query or if you are looking for anyother thing.
Reg
DsK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Plant Parameter settings are necessary to run the MRP for Plant.
Some important settings are Bom/routing selection, BOmmexplosion , planning Horz, MRP contoll , planned order .
Please check with OPPQ & get the details with F1 help.
All the settings should be "maintained" before the MRP.
Pradeep
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.