If i am scheduling a reports whcich has drill down information then how does it work?

Regards,

Anita

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member199945
Active Contributor
0 Kudos

Hi ,

It depends on the format which we schedule if we schedule it as webi format(*.wid) or schedule to a repository then drill down will work and if we schedule either in excel/csv/txt then drill down feature wont work.