MRP SLOC with External requirements

I want to setup SLOC MRP, so that it plans separately taking into consideration external requirements. Can you please advise if this can done?

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Best Answer
    Jan 03 at 09:48 AM

    Probably you can explore MRP Area Level MRP for this requirement.

    Regards,

    Sundaresan.K

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Krishnamoorthy - We have weird configuration set where the main location 9999 defaults to one location and then there is other default within the same plant for another location. Both of these locations are under one umbrella, but have different demands. Currently, they are being planned using Area Level MRP which defaults everything to 9999 location. I want to separately plan these location using MRP. I was told SLOC MRP would do it. But, it doesn't follow the demand in the other location

  • Jan 04 at 10:36 AM

    Hi,

    Probably this may help you.

    https://blogs.sap.com/2015/07/01/basics-of-mrp-area/

    Regards,

    Sundaresan.K