Skip to Content
0
Former Member
Apr 15, 2008 at 05:10 PM

Engineering Change Management

14 Views

Hi

I have a situation wherein the customer wants to track inventory based on Engineering change.

For example if Part1 has components A, B and C ; based on ECM the component C is replaced by D from a specific date.

How to track inventory in this scenario based on ECM

Thanks a lot

Edited by: SunnyD on Apr 15, 2008 7:10 PM