cancel
Showing results for 
Search instead for 
Did you mean: 

How to Change Security Architecture to define at Node Level in SAP BPC

Former Member
0 Kudos

Hi,

We have a situation to wait for Master data loads to be completed for new company code updation in SAP BPC system,For that we need to wait till some day after PEC(period End Closing) for every new company updates.do we have any streamlining procedure for this instead to wait till PEC to be completed. how to Change Security Architecture to define at Node Level or how to streamline the process of MD updates.

Accepted Solutions (1)

Accepted Solutions (1)

former_member186338
Active Contributor
0 Kudos

Not clear what do you want to achieve! Please provide the desired scenario.

Former Member
0 Kudos

HI Vadim,

Thankyou for the reply

We are planning to streamline the Master data loads from BW/ECC system.

everytime we get a request to add the new Company code(org unit) we need to wait till functional team need to load the Master data loads in BPC info objects and dimensions to do our security updates,

is there any possibility for below options Change Security Architecture to define at Node Level and stream line the MD updates,

former_member186338
Active Contributor
0 Kudos

Sorry, but I am lost! What BPC you are talking about? BPC MS or BPC NW???

Former Member
0 Kudos

Hi Vadim,

Presently we are running on NW 7.4 SPS 16 BPC 10.0

former_member186338
Active Contributor
0 Kudos

OK, I will alert moderator to correct your incorrect primary tag!

former_member186338
Active Contributor
0 Kudos

Tag is corrected by moderator!

Now please explain me the required scenario when you load new Company codes from BW.

You can configure Data Access profile to define security on the node level of Company Code dimension.

Former Member
0 Kudos

Yes Vadim,

Thank you for correcting the Tag, Your assumption is correct here,

When we get new company code updation in the BW system, we will wait till PEC(Period end closing) to update the same in Node level and Data Acc Profile in BPC system.is there any possibility for no need to wait till the functional team to load the new company code data after the PEC freeze in BPC system,is there any automatic loads happens from BW to BPC in all the Node level and Data Acc Profiles and Analysis Authorizations in BPC system

former_member186338
Active Contributor
0 Kudos

Sorry, but still not clear!

Please provide step by step sample!

Answers (0)