Skip to Content
author's profile photo Former Member
Former Member

How to Transport in HCI

How to transpoert the objects from test environment to production in SAP HCI

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Dec 28, 2017 at 03:20 PM

    Hi Manju,

    There are 2 ways of transport available currently -

    1) You can export the integration project locally and deploy the same in prod.

    2) You can go for CTS transport. You can set up CTS transport connecting with backend ABAP system as we do in PI.

    Thanks,

    Apu

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.