cancel
Showing results for 
Search instead for 
Did you mean: 

test call of transport control program (tp) ended with return code 0232

Former Member
0 Kudos

Hi SAP Guru,

I release transport task in DEV and task is released successfully but when i release main request then i got a message :

test call of transport control program (tp) ended with return code 0232

I have checked the transport root is ok.

This problem is comming in SAP ECC5 and os is AIX.

Please help me if any one have some idea related to this.

Regards,

Anil

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Are you in the right Client ? Are you the owner of the request?

Former Member
0 Kudos

Hi Shaji,

Thanks for your prompt reply, I am a super user after that i got this message.

Regards,

Anil

Former Member
0 Kudos

Hi,

I am in right client and i am owner of the request also super user in all the clients.

Regards,

Anil

Former Member
0 Kudos

Check if the request is locked, you can check in SE03.

Former Member
0 Kudos

Hi Shaji,

I have checked it earlier also the request is not locked. I am not understand if request task is released then what is the problem in the main request number.

Please can any one suggest regarding the same.

Regards,

Anil

Former Member
0 Kudos

On Transport Domain Controller:

- goto /nSTMS

- Overview -> Systems

- Click client <PRD SID> then select ‘SAP System’ -> Update Configuration (Ctrl+F2)

- Extras -> Generate RFC Destinations

- Repeat this for Controller instance itself!!!

On Domain Clients:

- goto /nSTMS

- Overview -> Systems

- Client its instance (eg DEV) then ‘SAP System’ -> Update Configuration (Ctrl+F2)

- Extras -> Generate RFC Destinations

After this done, test your ‘RFC connections’.

Former Member
0 Kudos

Note 165708 - Test call for tp ended with error code 0232