on 12-24-2017 1:55 PM
Hi All,
We are running 3 background macro jobs in parallel on Planning Book for Product-Location on a selection profile.One of the macro fails with error message : SOME CVC's cannot be processed in block XX.
I am getting a below error in job log:
Note: Parallel processing profile is used with block of 500.We run consistency and initialization before the macro chain starts even then it fails, and we are loosing crucial time in our planning process.
As a work around we run conc check and it passes by(But we are loose time here), but i need to know the root cause.
Thanks,
Rahul
Hello Rahul,
This error normally mean that the Pegging Area (product/location combination) was not Found (INVALID_PEGAREA).
This is the object not found error for a pegging area.
Please recheck the scenario and the selected data.
Also, please check the reports under note 577038
Thank you.
Werner Hansen
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Werner,
Thanks for your reply.
But if I repeat one of the failed process(E.g. 3 parallel background jobs running in Process chain) the same gets over without any issues.
Want to know why this is failing in first place, as we are losing time reprocessing it.
My understanding says, are few Prod-Loc combinations are getting locked or used by same running parallel job.
Please let me know your thoughts!
Regards,
Rahul
User | Count |
---|---|
10 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.