Hi!
I have problem in establishing connection with our new copied production portal and a R3 system. When I tried to access I get an error message saying connection to partner broke. But when I do a test connection to portal system to R3 system and BW system , Connection is successful.
This new portal is a copy of an existing production portal and the R3 system is a copy of existing production R3 system. We are testing to upgrade our BW system to BI and try to establish a connection test with Portal and R3,BW systems before moving to live production portal.
Steps I have done.
In portal
1. Created a new R3 (UR3) system and set connector properties to copied R3 system as it sits on a different server and named as different. Also this R3 system is different than our production R3 system as it is not load balanced. Because of this I created a dedicated system instead of SAP system with load balancing.
Properties of UR3
Portal System Name: UR3
Application Host: 10.58.32.250
Logical System Name : UR3CLNT400
Remote Host Type : 3
SAP Client : 400
SAP System ID: UR3
SAP System Number: 02
Server Port: 3602
System Type : SAP_R3
Logon Method : SAPLOGONTICKET
User Mapping Type : admin,user
Alias: UR3
2. Created a SAP Reference system with
Properties of Reference System( UR3 is used as Reference System)
Portal System Name: SAP Reference System
Application Host: 10.58.32.250
Logical System Name : UR3CLNT400
Remote Host Type : 3
SAP Client : 400
SAP System ID: UR3
SAP System Number: 02
Server Port: 3602
System Type : SAP_R3
Logon Method : UIDPW
User Mapping Type : admin,user
Alias: SAP_REF_SYSTEM
3. Created a new BW system
Properties of Copied BW system (USE)
Application Host: 10.58.32.250
Logical System Name : USECLNT480
Remote Host Type : 3
SAP Client : 480
SAP System ID: USE
SAP System Number: 01
Server Port: 3601
System Type : SAP_BW
Logon Method: SAPLOGONTICKET
User Mapping Type: admin,user
Alias: USE
4. UM Configuration > Security Settings
Assigned the SAP Reference System. Restarted the portal.
Question :
UM Configuration > SAP System
Under this I can see Client , User ID , Password. Do I have to change this? What User ID should I used here. Since this is a copy I guess I dont need to change this.
5. In the Portal created a new Certificate Key pair. Here DN of the owner is changed to CN=BC1.
Question: Our copied portal system ID is UPO. Whether DN of the owner should be CN=UPO?
Question :
Under the ACL , whether I have to add both portal system and UR3 system certificates.
6. I log in as a UME user and we use single sign on with logon tickets to back end systems. Also use a SAP reference system as our users R3 username is different from portal user name. I am not doing user mapping here as we use logon ticket. System is going to use LDAP as a data source. However we havent configured LDAP for this test. But in the UM Configuration we have still mentioned the LDAP settings.
Do I need to do anything other than mentioned above?
Your help is much appreciated.
Ramesh