on 04-10-2008 6:56 AM
Dear Sir,
In MMBE lot is in Q.Inspection.But after doing QA32 the system shows the inspe.lot.But with RED signal. Why?
What setting shud be required for UD?
Urgent.......
Points will be rewarded.....
Thanksin advance
Hi Sonal,
The Inspection Plan might have not been assigned.
Go to QA02 - Change Inspection Lot and click on the Inspection specification tab, then click on Tasklist/Specifi and select the Inspection Plan
Save the lot.
Thanks and regards
Murugesan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
any error message has come after doing qa32?
reg
S.Anbalagan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
1. If the start data was exceeded, the traffic light is red
2.If the end date was exceeded, the traffic light is red.
3. If the usage decision still has to be made. This means that if the end date has been reached and no UD has been made, the traffic light is red.
4. If there are outstanding short-term characteristics, the traffic light is red.
5. If there are outstanding quantities, the traffic light is red.
Regards,
Anand.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Sir,
In first lot RED signal & at the end message CRTD
In second RED signal & at the end message REL
Why it is?
Which message we will required?
After UD, message is UD ACCEPT,but not showing anything.
How to do result recording.& transfer lot to unrestricted.
In Mat.Master I assigned 04 type.
Please reply
User | Count |
---|---|
91 | |
7 | |
7 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.