cancel
Showing results for 
Search instead for 
Did you mean: 

CCA and PCA retraction in Integrated Planning

Former Member
0 Kudos

Hi all,

Please I need some orientation about CCA an PCA retraction when you are using Integrated planning.

I read blogs about CCA retraction (made by Praveen Mayalur) and was very helpfull, but it only refers a planning scenario using BW-BPS, and I don't have the same structure to send the data in the integrated planning.

I had looked in SDN and SAP portal, and I can't find anything about it.

I hope you can help me.

Thanks in advance, best regards

Inge Eichhorns

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

You can utilize BPS to run the CCA retraction to your ECC system. You just create a planning area on your IP planning cube and follow the instructions in the Blog.

PCA retraction is more complicated. There are function modules similar to the CCA retraction in BI. However the coorespoinding programs are not in ECC. In order to get these you must use SAP remote consulting and have them installed in your system

Mike.

Former Member
0 Kudos

Thanks Mike for your quickly response.

I have another question: about the programs in ECC wich are used to load data, I know there is a BAPIS that allow you to post data of CCA into ECC (BAPI_COSTACTPLN_POSTPRIMCOST, BAPI_COSTACTPLN_POSTACTOUTPUT) when you don't have standar retractors, when you talk about the programs do you refer to those BAPIS??

Then yes, I was looking in ECC and there is no BAPIS to post data to PCA tables, then you say we must to develope that BAPI? or we have to ask to SAP for them??

Thanks again

Inge Eichhorns

Former Member
0 Kudos

Hi

1) Retraction are driven by BPS, IP is not equipped with Retraction.

2) Cost Center & Internal Order Retraction should be configured through in BPS--> Planning Area; Planning Level, Planning Function; Parameter Group.

3) You need to configure Source Structure, based on business requirement you need to ensure that the retraction happens either in CO Currency or Transaction Currency.

4) Try to use the SAP Standard Function Modules for Cost Center and Internal Order Retraction. Refrain from copying & modifying the same.

go through the Cost Center Retraction relevant documents and they are very helpful.

5) Function Modules for Profit Center Retraction are not available in ECC due to the New GL Concept.

6) If possible advise the Business to use "File Upload" for Profit Center Data.

Regards

Srinivas

Former Member
0 Kudos

Thanks to all, I'm clear now.

I will contact to OSS SAP for the problem of PCA, and for CCA, I will develope with the old way in BW/BPS.

Thanks again!!!

Inge Eichhorns

former_member319022
Discoverer
0 Kudos

Hello Inge,

did you contact oss sap regarding pca retraction? Pls can you post the results.

Thanks

Stephan

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

Retraction is not supported by Integrated planning. We should make use of BPS to go with retraction.

Regards,

Srinivas Kamireddy.