Skip to Content
author's profile photo Former Member
Former Member

FI COPA transfer structure Urgent

Hi Gurus,

I really need your help. Can any one please tell me about the FI- COPA transfer structure please.

Do I have to assign each and every cost element that I have in my COA ? ? How does the transfer structure works ? Do all my revenue and costs have to be assigned to a value field ?

Please help .. I will assign all points

Thanks

JP

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Apr 08, 2008 at 05:12 AM

    FI Copa Structure enables you to see your expenses incurred in Financial Accounting has been transferred to COPA FI-COPA Structure to see them in COPA.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Apr 08, 2008 at 05:13 AM

    FI COPA Transfer structure means it will enable you to see expenses incurred in

    Finanacial Accounting to see in COPA via FI-COPA Transfer structure.

    Sivakumar

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Apr 08, 2008 at 04:16 PM

    FI-COPA transfer structure is very complicated and you need to do this very carefully. As you might know that this is one of the methods of posting into COPA anything that is posted in FI. But it is not neccesary that every cost element is customized here. Usually only those are customized that have clear definition e.g. PPV, Cost of Sales etc.

    You have to balance this approach with other ways information is flowing into COPA like assessment cycles and settlement. So even though all P&L accounts in FI must have a corresponding entry in COPA, you dont customize all of them in the Transfer structure. I would suggest to make a list of all cost elements and figure out how you want them to be posted in COPA. Again this is a long and complicated process.

    Assign Points if useful

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      I have already assigned PPV for E1 and

      FI has COGS and Even manual revenue adjustment to the value fields but not sure as how to assign the remaining cost elements.

      There is Sales Manual adjustment. How do I assign that ?.. Do I have to assign all the remaining cost elements with category "11" revenue to ERLOS ?

      Is there any documentation on this apart from TOP Jobs config doc ?

      Please help

      Thanks

      JP

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.