SLED: How to update after GR and create TO.

Hi

I have the requirement that the business would like to provide the SLED when creating TO from the Interim into the WH. HU Management is been used.

I have set the configuration for SLED to be managed for the plant and did not flag the setting '1' for movement 101 - Stock is recipted via Inbound into WH from where TO is created for SU afterwards.

Material is SLED managed and setup in Master data.

After receipting the stock into the WH I try and do LT09 and system gives me an error to provide SLED. I then access LS22 and update the quant with SLED.

However, system still gives me the error.

So my question is:

- If you dont make SLED mandatory at GR, then how does one update the SLED so that it updates in both the HU (VEPO) and the Quant so that the TO can be created.

What am I missing?

Thanks

Clayton

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    Dec 18, 2017 at 09:50 AM

    Is your material batch managed? If shelf life expiration date is important then materials are usually batch managed. And in this cases the shelf life expiration date is either entered during the goods receipt or calculated based on the entrance of manufacturing date during the GR posting.

    I am not aware that you could bypass this at GR and enter it later. If you have later a better information than the default (which could be today as manufacturing date) then change the date in MSC2N