Skip to Content

report of change number

In CS02, I have changed the description of installation point in sub_item of BOM, from SW1 to SW111. but in CC07 I couldn't see the detail of the change. is there any additional setting required?

the only information is date of change and the user who has changed the BOM.

Add a comment
10|10000 characters needed characters exceeded

  • for example when I change the quantity of an Item in BOM, a new tab is shown in the cc07 named BOM and the change information is available there. but by changing the description of sub item, no log is possible in cc07

    in CS14 we can see the difference without change number, but again with change number no change is shown

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.