Skip to Content

What should be used for Imported Spare ?

Dec 17, 2017 at 10:47 PM


avatar image

Question 1 - What are the design principles in general followed for import spares MRP? For domestic: We can follow MRP for All fast moving, Slow moving high critical and Non moving high critical; and MTO for Slow moving low critical.

If we use the same principles for import spares, it is resulting in a very high cost impact on the inventory value due to ROL of 1 allowed in SAP (Which we don't want to change).

Mainly the cost impact is driven by slow moving high critical.

Question 2 - Thinking logically it makes sense not to include any slow moving import spare in MRP. This way we might have more number of spares as MTO.

Question 3 - What are industry practises for import MRP? Which levers are used to determine MRP or MTO? If we use the same levers whihc categories should be in MRP or MTO?

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers