Skip to Content
0
Former Member
Mar 31, 2008 at 11:01 PM

Mass Change: Routing link to material master

69 Views

Hi,

I want to find out if a routing can be easily unlink to a set of materials, and a new routing can link to this set of materials?

The scenario is:

I have routing ABC and is tie to 50 materials. (for example: material group A with 30 materials and material group B with 20 materials)

I want to create new routing XYZ, untie the 30 materials from material group A from routing ABC, and link these 30 materials to new routing XYZ, and still leave routing ABC tie to the 20 materials for material group B.

Is this a standard function of SAP routing changes?!

Thanks,

Alice