Hi,

I want to find out if a routing can be easily unlink to a set of materials, and a new routing can link to this set of materials?

The scenario is:

I have routing ABC and is tie to 50 materials. (for example: material group A with 30 materials and material group B with 20 materials)

I want to create new routing XYZ, untie the 30 materials from material group A from routing ABC, and link these 30 materials to new routing XYZ, and still leave routing ABC tie to the 20 materials for material group B.

Is this a standard function of SAP routing changes?!

Thanks,

Alice

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Mar 31, 2008 at 11:21 PM

    Hi Alice Trieu

    Go to material assignment tab and delete the 30 material and then add those material of group A to routing XYZ through the material assignment tab.

    Please back in case of problem.

    Regards,

    Satyajit

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.