I want to implement :
use co11n to make production confirm ,after this how to make to material automatic delivered to stock ?
thanks!
Hi
Go to routing of that material and in the last operation use the control key as PP99 and save.
Then u can get the stock automatically.
Nanduri
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You are asking about auto goods receipt.
Please do one of the following setting to get the above.
1. In in detail view of control key PP01,make tick mark in auto goods receipt. Use this control key in last opn of the routing.It will not work if you use this control key in all the opn.
2. Use tcode OPKP - Production scheduling profile .
In this make tick mark in auto goods receipt.
Assign this profile in work scheduling view of material master.
If you want to do auto goods receipt, do the setting one from above.
If you don't want auto goods receipt remove the tick from both settings.
Regards,
Dharma
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
thanks!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
check the control i for the last operation in the routing, ur control key should have AUTO GR tick.
And for AUTO GI ur material components should have backflush indicator as '1' for consumption
Reward if useful
Amit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.