on 12-13-2017 9:15 AM
Dear all,
I have an issue with the period factor being updated from ECC at product level, And I dot not find why.
We are using a simple weekly lot size WB in ECC, and it is transmitted in APO - so far so good.
But the standard WB us a Scheduling logic as "Requirements date := delivery date" in the configuration.
In APO, we need to set the plannig factor to position the order within the week.
Unfortunately, the Period factor is beibng updated by the CIF each time time the product is changed in ECC. It is reset to none, and the Planning factor use is unticked.
1) Up to my knowledge, this field is not normally include in the CIF Is that correct ? If the field is transmitted any ideas for the period factor in APO not being deleted after retransfered.
Note
1) I check the ECC user exit (ZXCIFU01) and the APO Extension and found no trace of any specific treatment relative to this zone.
2) It is normal in bd52 that the lot sizing procedure is DISL is part of the changes transferred
Many thanks for your help
Pierre Mikaël Noat