Is there a way to put a placeholder for capacity?

Hi. I'm running into an issue in ECC 1.44 where we don't have visibility to real capacity at a production location because we have FERTs that are not in OK status yet. Is there a way to create a placeholder (maybe based on the run rate and volume) in the system to account for these that are in process of being set up, but not in OK yet?

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.