Skip to Content
author's profile photo Former Member
Former Member

Recurring Inspection with Multiple Inspection interval

We have a requirement of multiple Inspection interval for recurring Inspection .After PO GR Inspection , Need to generate 2nd lot in 15 days and 3rd lot should generate in 25 days. Could you please help how we can map this scenario interns of standard or any enhancement required.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Dec 11, 2017 at 01:21 PM

    Multiple inspection lot intervals is no possible with standard SAP. Over the years, there have been discussions on this topic.

    I suggest you do some searches. There is an available user exit that can be used to incorporate your own logic. You should be able to find it with your searches.

    Craig

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.