on 12-10-2017 9:26 AM
Dears
We have a standard material XX0001 which is produced and issued to FG material.
We have maintained the standard price of XX0001 manually (without costing run) in the material master.
When we see the cost analysis of the finished material, the plan price of the standard input material XX0001 is not appearing. Is it because we have maintained the standard price manually without costing run ?
Please advise.
Hi Nikki,
Check which planned costing variant is assigned to the plant and order type that produce that material via OPL8 (cost accounting tab)? Then check the valuation variant strategy via OPL1 . I believe your material price control is S. Make sure you have strategy sequence for 2- Standard price or 7 - Valuation price according to price control in material master. If you don't have one of it, assign it to the strategy and save. Run CO02, Click on the calculator icon or CTRL+F7 key to recalculate the cost. You should able to view the plan cost in cost analysis after this.
Thanks.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks for the valuable inputs.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
let me explain it again. following types of cost is available in system.
Planned Cost
Target Cost
actual Cost
planned cost is the cost that system takes from the material master and multiplies it with the production order lot size.suppose you production order is created for 100 unit and as per material master its standard cost is 10 USD then plan cost will be 10*100=1000
Target cost is the cost that system takes from the cost estimate of the material and system multiplies it with the actual produced units on a production order e.g. out of 100 only 80 units are produced against a production order then target cost will be 80*10=800
so if you are maintaining material price manually then you can get plan cost in variance report. but target cost will not be available
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks.
I am talking about the plan cost of a component which is also produced in-house. It is a make to stock normal item and the price is normally stable. Hence we updated the standard price manually.
Best regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
well you are talking about target cost of plan cost? if you are talking about plan cost then you can calculate plan cost on an order by simply clicking on calculator icon (third icon from releasing flag on order screen) on order or by using CTRL+F7 key. after that you can see plan cost on an order in KKBC_ORD report.
why you are not using costing run?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.