result oriented order multilevel bom

I have a question related to result oriented order BOM. I have created multilevel structure where I have header bom A with characteristic A1. now I have lower level material B (configurable - result oriented order bom) which has char B1 and I have written procedure rule to assign value to B1 from root material char A1. Now after creating sales order for A with value A1 = 2. I did changes using CU51 for B and changed char value B1 to 5. and then again I changed A configuration using VA02 and assign A1 = 6 and save the configuration. will it affect my B order bom and its value B1?

I am asking this because I am facing one issue where Purchase order for B created with B1 = 5 and does not have latest changes which I did using va02 in A. it has configuration which I did using cu51.

Please help!!