Skip to Content
0

STO no shipping and transport dates

Dec 08, 2017 at 09:13 AM

85

avatar image

Hello,

We are using STO process with route determination. For this we have activated route and shipement scheduling in:
MM> Purchasing > Purchase Order > Set up STO> Assign delivery type and checking rule.
We expected to have shipping and route dates in the Delivery Schedule tab of PO, here is a screen shot of the PO where all time dates are ZERO.

Any suggestion on what may be missing in order to have the dates displayed

Thanks in advance

fwfgd.png (22.5 kB)
10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

1 Answer

Best Answer
Jürgen L
Dec 08, 2017 at 02:49 PM
0

Can you show your customizing from the mentioned path?

Or compare it yourself with the information shown in the video: https://www.youtube.com/watch?v=6iA4NDuf-IA

Show 7 Share
10 |10000 characters needed characters left characters exceeded

Thanks for the link Jürgen, I have watched and compared my settings. It seems our system is configured the same way as in the video.

Here is how the shipping and route scheduling are set.

lwldg.png (33.8 kB)
0

can you add a screenshot from the shipping tab?

I think somehow it does not find its way to the corresponding data to derive the settings from the shipping point and from your routes

0

CH2 = 2 days transit time

peup3.png (28.2 kB)
0

I am bit confused why the fields loading group and transportation group are empty here, as they are usually very important for route determination.

0

Your comment is pertinent. I have solved it by adding the loading group in "slaes: General/Plant" view of the material master. Thanks much

0

Jürgen, do you know if there is a possibility to define in the customizing a loading group per plant? (Example a loading group from plant XXX to YYY = 001)

Thanks in advance

0
Show more comments