Strategy 70

hi,PP friends:

i want to make it clear whether Strategy 70 can be used in repetitive? if so, how does the consumption happen? thanks for your any idea.

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Mar 21, 2008 at 07:39 AM

    Hi

    Planning at assembly level -70 can be used for Repetetive manufacturing of assemblies.

    assign Strategy group 70 on the MRP screen.

    Set the indicator for assembly planning, the Mixed MRP indicator, to 1 on the MRP screen.

    Set Consumption parameters (Consumption mode, Bwd consumption, Fwd consumption on the MRP screen) to allow for consumption of planned independent requirements.

    If you are using this strategy in a make-to-stock environment, you also must set the Individual/coll. indicator to 2 on the MRP screen.

    Planning

    Planned independent requirements are entered at assembly level. Procurement (planned by means of the planned independent requirements) is therefore triggered before the production order stage (or schedule line in repetitive manufacturing).

    This PIR for the assembly will be consumed by the dependent requirements from the fianl assembly

    Hope this helps

    BR

    SK

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 21, 2008 at 08:34 AM

    Hi Wang

    ,PP friends:

    i want to make it clear whether Strategy 70 can be used in repetitive? if so, how does the consumption happen? thanks for your any idea.

    Strategy 70 can be used in REM. But this 70 is planning at assembly level. You will not be having requirement type for customer requirement. So you cannot pass customer requirements for this materials. You can use this for depedent req level.

    For Finished products you have to use 40/20. According to your requirements.

    Regards

    J . Saravan

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 24, 2008 at 03:35 AM

    Hi,

    This strategy is very similar to Planning with Final Assembly (40). However, planned independent requirements are consumed by production order requirements (or schedule lines in repetitive manufacturing) and not to requirements of sales orders

    In strategy 70 , the consumption of PIRs will happen (acc to cons mode/period maintained) ,

    when the Dependent requirements are passed down to the Assembly

    (similar to sales order reqmt passed on in strat 40).

    If PIRs are not consumed , pls check the consumption mode and periods maintained.

    Regards,

    Sheik

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.