Skip to Content

Bill max demand value for the period with meter replacement (legacy to smart meter)

Dec 07, 2017 at 05:04 PM


avatar image

We have a scenario, legacy meter is replaced with a smart meter in between the billing period. Demand is also one of the billing components. During billing for the period having a meter replacement, Max demand need to be determined between the meters of different nature and the determined max demand value need to be billed for entire month. Do we have a standard variant program to handle this scenario ? Please let me know. Thanks.

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers