on 12-07-2017 2:02 PM
Hi Gurus,
I am executing costing run for materials using CK40N. I noticed that production version field is empty for all materials. As a result, system is going by the first recipe. However, as per my understanding, system should go as per the first production version. This version contains a different recipe.
Note- I am using S4 Hana. So PV selection method field in MRP4 is no longer there.
Can you please help to understand if there is some different setting to be maintained elsewhere?
Hi Amit,
Check this note 2420112 - S/4 Hana: Production version selection in material costing.
You can maintain production version in the costing view of the material master (e.g. BOM usage) are still relevant and they will be used to determine a valid production version.
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi KK Lam,
Many hanks for your response. It works!
In addition, we found that above note will pick up the first available production version, irrespective of whether the costing lot size and PV lot size are same or not. In order to allow picking of production version as per costing lot size, we need to implement one more additional note i.e. 2477461.
Thanks again
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
11 | |
6 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.