How to change the valid from date of the bom header?

Former Member
0 Kudos

ECM is active in the system.

I want to change the valid from date of the BOM header with the help of a change number.

How can I change it?

Accepted Solutions (1)

Accepted Solutions (1)

former_member698542
Active Contributor
0 Kudos

Hi Amit,

Copy the BOm and Create a BOM with new valid from date and if you don't want the old BOM delete it.

Thanks and regards

Murugesan

Answers (3)

Answers (3)

Former Member
0 Kudos

Hello

Lets assume that, we are going to change Management for controlling Valid From date

Steps to be followed for creation of Change No

Tcode CC01 for Change No

Click on Change Master

Once you enter into Change master, maintain the description

In the Valid from Date, maintain the date from which you BOM should be current

'

Maintain the Status (01)

Click on Ojbect Type, maintain for which Object types is the Change no needs to be active i.e. for BOM, Rtg, etc

save the Change No

After the change no is created

Enter the Change No during the creation mode of BOM

THe system copies the Valid from date from Change No

Former Member
0 Kudos

Hello friend,

Once you created BOM with the Valid from date than its not possible to change it again.Only solution is to delete the BOM and create it again with the new valid from date whatever you want.

I hope the information which i gave is useful to you.

Former Member
0 Kudos

Is there any exit or bapi available through which we can make valid to and valid from date as editable for the user?

Thanks in advance

former_member196530
Active Contributor
0 Kudos

Hi

If you are authorised , please goto T-Code : CC02 with the present change number and you can click on the button beside the Valid from date under description.Hope this will help

you to solve your problem

Regards

Jia