Hi,

I have a vendor for one material.

How can I connect the both (vendor and Material). ?

Ca I do it In the Material masta data MM01?

Thanks

Dede

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Mar 20, 2008 at 10:09 AM

    Hi,

    You can connect them by both inforecord and source list.

    Regards,

    Rambhupal reddy

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 20, 2008 at 09:57 AM

    you can connect material with vendor by info record in me11

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Mar 20, 2008 at 09:59 AM

    Hi,

    You can connect them by creating / maintaining source list (ME01 / ME03 /ME04). If you maintain source list, info records, material masters, vendor masters (quota arrangement in case of several sources of supply) you can convert PR (created during MRP run) to PO very easily.

    BR

    Csaba

    Edited by: Csaba Szommer on Mar 20, 2008 10:59 AM

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.