Hi,

I have a vendor for one material.

How can I connect the both (vendor and Material). ?

Ca I do it In the Material masta data MM01?

Thanks

Dede

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

You can connect them by both inforecord and source list.

Regards,

Rambhupal reddy

Answers (2)

Answers (2)

csaba_szommer
Active Contributor
0 Kudos

Hi,

You can connect them by creating / maintaining source list (ME01 / ME03 /ME04). If you maintain source list, info records, material masters, vendor masters (quota arrangement in case of several sources of supply) you can convert PR (created during MRP run) to PO very easily.

BR

Csaba

Edited by: Csaba Szommer on Mar 20, 2008 10:59 AM

Former Member
0 Kudos

you can connect material with vendor by info record in me11