MRP run for a list of materials

I understand MRP can be run for a single material by MD03 and MD02. But can I run MRP for a list of materails, I don't want to run it for all the materials.

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Best Answer
    Posted on Mar 19, 2008 at 02:44 PM

    Dear ,

    Here is your answer

    Total planning(MD01) covers the planning of all the materials that are relevant for requirements planning and includes the BOM explosion for materials with a bill of material.

    You can use total planning for a single plant or you can use the scope of planning(Key with which you can combine a group of plants or MRP areas in a scope of planning.) to control whether the total planning run is executed on a multi-plant level

    1.for several plants

    f2.or one MRP area

    f3.or several MRP areas

    4.for a combination of plants and MRP areas.

    What u have to do is

    1.Create a scope of planninng in OM0E and assing your plant or MRP area under which u have the list of material and u want to runn the MRP.

    2.Goto MD01-Total planning -Online and assing the scope of planning and plant and execute.

    Hope this will solve your problem.

    Reward point if useful

    Regards

    Jia

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 19, 2008 at 03:50 PM

    Hi,

    With MD01 we can run all the material s in the plant.

    You can restrict the material list by user exit. In MD01 initial screen there is a option for user exit.

    For this exit you can create a program with help of Abaper to run the material by selected MRP type.

    You can select material MRP type PD or VB.

    So your material list will reduce.

    Regards,

    Dharma

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Mar 19, 2008 at 04:04 PM

    Hi Balaji,

    MRP run can also be scheduled in background using transaction MDBT. A variant is created for with the respective plant & parameters & scheduled for a date with time. Then MRP run takes place for all the materials in that plant.

    Regards,

    Senthilkumar

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 20, 2008 at 06:14 AM

    Hi balaji

    If you want to restrict MRP run it is possible only by User Exit.

    in MD01 you can see at the bottom. You can use it for restricted MRP type and Material Type.

    If your list of material is the same, all the time use this and ask ABAP's to code for your requirement.

    Regards

    J . Saravan

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 20, 2008 at 07:09 AM

    Hi Balaji,

    you want run MRP for list of materials, pls ask to your ABAPer to write simple BDC program code for run MD02.

    See below link for sample code MRP run TCode MD02

    http://www.sap-basis-abap.com/abap006.htm

    Regards,

    Sankaran

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.