Charge Calculation

Dec 05, 2017 at 11:44 PM

22

avatar image
Former Member

I am trying to configure TCCS in SAP TM 9.1

I have four charge types, discount, minimum, base freight and fuel.
For example : Base freight = 100 , discount = 85% of base freight, Minimum value = 50 While charge calculation in order, system should first calculate discount based on base freight and compare its value with Minimum, which ever is greater system should add a fuel surcharge value 30 to it. As per the above scenario, system should propose a rate of 115 I.e 85% of 100 = 85 85 > 50 So , 85 + 30 = 115 in the order

How to structure tccs to achieve this