PO replicated in ECC doesn't contain contract number

Hi All,

I'm using the Extended Classic Scenario; in the PO automatically replicated in ECC there isn't the contract number.

In SRM and in ECC I have the same contracts with the same numbers. Then if the ECC PO doesn't contain the contract number, only the SRM contract is used and the release value of the ECC contract isn't updated.

What can I do to import the reference to the contract number in the PO replicated from SRM in ECC?

Thanks in advance.

Best Regards.

Antonio.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Mar 14, 2008 at 06:30 PM

    Hi Antonio,

    i am getting advantage of having contracts in two places, in ext-classical, the contract call-off takes place locally(SRM) and when PO created, it just replicated back to R/3. the contract reference is not pushed back.

    However for reference purpose if you want to do , use the PO business add-ins, but this will require custom development.

    Cheers, Renga