PI patch upgrade activity

Dear All,

We are updating the PI patches in our PI system. Actually we are in PI 7.4 SP8 patch 0 then we are updating recent patches to system. So kindly please help me what are the activities (step by step) to be done PRE & POST update.

Thanks & Regards,

Ramu

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    Dec 04, 2017 at 05:09 PM

    Not sure if the question refers to a production environment or complete landscape. Assuming it is for landscape (DEV-->QAS-->PRD) and may be you have Sandbox or POC kind of system, then start with this system to see any side effects of patches.


    From technical perspective below if the high level upgrade steps:

    1. Stop all communication channels, Business process engine, background Jobs. Interfaces should be stooped so if there is any system which may try to push data to PI , then that system should be handled so that that push is not attempted.

    2. Use SUM to apply patches.

    3. Once SUM is finished, make preliminary system check.

    4. Reverse the step 1. Bring everything back up.

    5. PI and Business tests needs to be done to verify all interfaces are working.