I have a routing with operations 10 and 20.

The Finished material is FG has WIP . WIP has the RAW material.

How do I setup the BOM and Routing with component allocation such that

OPN 10: Consume RAW and make WIP on operation level confirmation at opn 10..

OPN 20: Consume WIP and make FG on Operation level confirmation at opn 20.

Since there is only one "Routing" there is only one "Order" for the FG.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Oct 20, 2016 at 06:46 AM

    Hi,

    You can try for following process allocate the component in operation level

    define WIP as by product which will be consumed in next operation .

    so you can try the process if any query kindly revert.

    Thanks & Regards

    Sandeep Kumar Praharaj

    Add comment
    10|10000 characters needed characters exceeded

  • Oct 20, 2016 at 07:19 AM

    Hello S S,

    Here for example you are having A is a Raw material and B is the WIP material which is produced from A

    and C is the Final FG which is produced from B

    Here create the BOM for C by maintain the component as B, and BOM for B by maintain the component as A

    similarly as suggested by sundeep you can maintain this in Routing at operation level

    while doing the operation confirmation for 0010 system will consume A and produce B, similarly for operation number 0020 System will consume B and produce the C

    Regards,

    Venkatesh..