Routing setup operation level

former_member231735
Participant
0 Kudos

I have a routing with operations 10 and 20.

The Finished material is FG has WIP . WIP has the RAW material.

How do I setup the BOM and Routing with component allocation such that

OPN 10: Consume RAW and make WIP on operation level confirmation at opn 10..

OPN 20: Consume WIP and make FG on Operation level confirmation at opn 20.

Since there is only one "Routing" there is only one "Order" for the FG.

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member185450
Active Contributor
0 Kudos

Hello S S,

Here for example you are having A is a Raw material and B is the WIP material which is produced from A

and C is the Final FG which is produced from B

Here create the BOM for C by maintain the component as B, and BOM for B by maintain the component as A

similarly as suggested by sundeep you can maintain this in Routing at operation level

while doing the operation confirmation for 0010 system will consume A and produce B, similarly for operation number 0020 System will consume B and produce the C

Regards,

Venkatesh..

sandeep_praharaj
Contributor
0 Kudos

Hi,

You can try for following process allocate the component in operation level

define WIP as by product which will be consumed in next operation .

so you can try the process if any query kindly revert.

Thanks & Regards

Sandeep Kumar Praharaj