Hi,

In our planning book, sometimes, when we change a value and save, we are getting a pop up with the message "Error for COM routine using application program (return code 40069)". When we click ok, the value in that cell is reset to the previous value.

I initially thought this is due to duplicate CVCs and ran the consistency checks, /SAPAPO/TS_LCM_CONS_CHECK and /SAPAPO/TS_PSTRU_CONS_CHECK. I found few and corrected them. Now even after correcting them, I am still getting this COM error.

I could not find any SAP notes on this.

I switched on the SQL trace in ST05 and executed the same operation to get the COM error.

I noticed this part of the trace that is unusual and I am guessing that is what the system is doing when I get the error.

Can somebody please explain me the meaning of this attached trace?

http://spreadsheets.google.com/pub?key=pMjKR_3qLaxblBDDPfRt6cw

what does the SIM_SIMSESSION_CONTROL do?

Does CALL USER.SAPTS_AGGMULT_TIMESERIES mean there are duplicate time series?

Thanks.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Mar 14, 2008 at 12:39 AM

    Hello Raj G ,

    You got the LCA RC 40069, the meaning of this LCA return code is

    "DP-Propagation aborted: update of init-increase is not allowed"

    The information given by you is not enouph to get clear on the reported issue:

    -> What is the version of your system?

    -> What is the version/build of the LCA package on your system?

    Did you get the reported issue with the latest released LCA build for the your SCM version?

    -> What LCA routine gave you the RC 40069?

    -> What application scenario you was running ?

    -> Could you avoid upploading initial values in your scenario?

    As SAP customer you have the SAP support option ==> please open the OSS ticket for the component 'BC-DB-LCA' if you have questions/problems with LCA routines to run the liveCache applications, we could logon to your system via OSS & check the reported problem closer on your system.

    Thank you and best regards, Natalia Khlopina

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.