Moving DMR setting from “ At Ud “ to “At Lot Creation “

Hi

The business has been using DMR with the radio button “ At Ud “

Meaning that the Quality Level only changes once the UD has been done , after a number of years they have realised that as their UDs can take some time and they have have had many deliveries they want to change this radio button in the DMR to “ At Lot Creation “

However I have tried to test this movement from one radio button to the other with already a whole load of legacy Inspection lots outstanding without UDs and basically it doesn’t seem to be moving the QL consistently on Lot Creation even though this is now the new setting . It still seems to behave in the same way as “ At Ud”

Sometimes it seems to work ok and other times it doesn’t and I can’t find a pattern as to why it’s behaving erratically

Does anyone have any experience of changing this setting part way through ?

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.