Dear gurus,
what is the minimum setting for implement ECM WITH T.C.
I HAVE GONE THROUGH LIBRARY
THERE IS SOME DOUBTS WHEN SHOULD WE CHOOSE
SUITABLE OPTION GIVEN BELOW-------
1.Simple change master record (with or without release procedure)
· 2. ECR / ECO
· 3.Change master record of an engineering change hierarchy
- A.Change leader (Leading change master record)
- B Change package
WHAT IS THE DIFFERENCE BETWEEN with or without release procedure)
POINTS WILL BE REWARDED
VIKAS