SO Item - Sceudule line configs

Former Member
0 Kudos

Hi,

Please give feedback on SO item, schedule line configurations and assignments.

Thanks in advance,

Kanishka

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

The last update provided the answer

Former Member
0 Kudos

you assign schedule line categories to item categories using following path

Sales and Distribution  Sales  Sales Documents  Schedule Lines  Assign Schedule Line Categories

Schedule line categories is executed depending on the MRP type that is specified in the material master record for a material

At the same time, you can enter a maximum of three schedule line categories with which the system default can be manually overwritten during document processing.

Please elaborate wht you exctly looking related to SO ITEM

Edited by: WISH on Mar 10, 2008 6:55 AM

Former Member
0 Kudos

hi,

the schedule line category is determined at VOV5 transaction and we make the required config settings to it at VOV6.

Item category + MRP type -


> Schedule line category.

regards

sadhu kishore