Hi,
Please give feedback on SO item, schedule line configurations and assignments.
Thanks in advance,
Kanishka
The last update provided the answer
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
you assign schedule line categories to item categories using following path
Sales and Distribution  Sales  Sales Documents  Schedule Lines  Assign Schedule Line Categories
Schedule line categories is executed depending on the MRP type that is specified in the material master record for a material
At the same time, you can enter a maximum of three schedule line categories with which the system default can be manually overwritten during document processing.
Please elaborate wht you exctly looking related to SO ITEM
Edited by: WISH on Mar 10, 2008 6:55 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
the schedule line category is determined at VOV5 transaction and we make the required config settings to it at VOV6.
Item category + MRP type -
> Schedule line category.
regards
sadhu kishore
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.