Equipment Maintenance

Hi All,

Need your inputs / guidance in creating maintenance plan for an equipment with performance based life time of 25000 units with external servicing required at every 5000 units.

The requirement is customer needs an notification in advance for the service of the equipment and information on the remaining units that can be produced with the equipment when the maintenance call is nearing while production order is being confirmed. The second requirement is a procurement proposal to arise when the equipment is sent to service for the final time i,e (fourth time after 20000 units are being produced).

Where can we maintain the lifetime of the equipment based on its performance?

Your valuable inputs are highly appreciated!!

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.