Hi Guru,

I have define cost sheet & also made assignments of overheads by define percentage OH rate to Raw materials . also see the report in CK13N where i got Cost estimate with Quantity structure. still the OH r not calculate. pls help me & suggest the step through which i got the ultimate results of calculate OH.

& one more question Should any body tell me where i can see cost sheet report? (except CK13N & KKPCN)

Defined Cost Sheet Structure is as follow:

Raw Materials

Material Overhead

Material Usage

Wages

Salaries

Manufacturing OH

Manufacturing Cost

Cost Of Goods Manufactured

Admin OH

Sales OH

Cost Of Goods Sold

Please Help me to work out.

Than'x & Regards,

Dhananjay

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Mar 04, 2008 at 11:57 AM

    Hi

    We can calculate actual overheads with the Tcode KGi2.

    Should u need the config document for Product costing, give me ur email id.

    Hope that helps.

    Pls assing points if useful.

    Vishnu.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Mar 04, 2008 at 03:20 PM

    Materials are to be assigned to an overhead group in its material master.

    Overhead keys are grouped together under the overhead group in the configuration.

    Rates are to be maintained for those overhead keys under the overhead rate for overhead type actual and plan for the valid period. The overhead rate to be assinged in the costing sheet.

    The overhead rate can be either percentage based or quantity based. If it is a quantity based, then the cost element need to capture the quantity (as maintained in its master data)

    When you run the cost estimate, in order to see the overhead to appear, the costed BOM and routing shall have the appropriate material or activity type, whose cost element is given as the base for the overhead rate in the costing sheet.

    The costing sheet shall be assigned to the valuation variant for the plant in the configuration.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 07, 2008 at 03:13 PM

    ANSWERED

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.